Wibax Engineering & Conversion Services

Turnkey Transition to Fossil-Free Heating

Switching from fossil heating oil doesn't require decommissioning your current boiler assets. Wibax delivers an end-to-end conversion process—from initial burner tuning and combustion trials to tank infrastructure and dedicated Nordic logistics.

Dual-Fuel Redundancy: Maintain fossil backup during your planned trial period

The 4-Stage Conversion Roadmap

Proven across hundreds of industrial and municipal combustion facilities across Sweden and Finland.

01Stage 01

Technical Site Assessment & Audit

Wibax thermal combustion specialists inspect your current boiler room, burner heads (e.g., Weishaupt, Oilon, Saacke), fuel line tracing, filtration units, and tank infrastructure.

Key Outcomes:
  • Fuel line compatibility report
  • Viscosity & preheating assessment
  • Emissions baseline documentation
02Stage 02

Fuel Specification & Engineering Matching

We match your combustion geometry to the ideal WiFuel grade (305, 320, TOP, or custom bio-flux) to ensure stable atomization without requiring complete burner replacement.

Key Outcomes:
  • Optimal fuel grade recommendation
  • Preheater sizing & nozzle selection
  • Dual-fuel redundancy plan
03Stage 03

Supervised Combustion Trial Run

Wibax delivers a test batch and coordinates an on-site test firing with your operating engineers, optimizing air/fuel ratios and verifying NOx/SOx and flue gas cleanliness.

Key Outcomes:
  • Flue gas emissions verification
  • Flame geometry optimization
  • Operator training on bio-oil handling
04Stage 04

Permanent Supply & Tank Management

Seamless transition to ongoing automated deliveries from Wibax deep-water coastal terminals, complete with tank level telemetry and freeze protection.

Key Outcomes:
  • Guaranteed winter delivery service
  • Automated reordering via telemetry
  • Annual quality & ESG reporting
Real-World Conversions

Proven Results Across Nordic Facilities

See how Swedish plant managers converted from fossil fuels to WiFuel with zero downtime.

Northern SwedenIndustrial Conversion

18 MW Municipal District Heating Plant

3,800 tonnes CO₂e eliminated annually

Converted three peak and mid-load boilers to WiFuel 305. The plant utilized existing underground storage tanks with updated trace heating, achieving complete fossil-free heating certification ahead of regional climate targets.

Previous Fuel:EO1 Light Fuel Oil & Peak Boilers
Central SwedenIndustrial Conversion

Asphalt Aggregate Drying Facility

Zero fossil carbon tax & 92% lifecycle GHG cut

Transitioned a high-throughput asphalt rotary drum dryer from heavy fuel oil to WiFuel TOP. Installed high-efficiency preheaters to atomize viscous bio-oil cleanly, delivering immediate compliance with municipal environmental permits.

Previous Fuel:Heavy Fuel Oil (EO4)

Book a Plant Conversion Assessment

Have Wibax combustion engineers inspect your boiler room and evaluate trial burn feasibility with zero upfront commitment.

Schedule Engineering Audit